Regulatory Operations
CMDh opens a route for EU line extensions into new Member States. What changes for MRP/DCP applicants?
On 19 November 2026 the CMDh published Rev. 8 of its recommendations on extension applications in MRP and DCP (CMDh/069/1999). A new Section 5.4 lets an MAH include Member States where the originator product is not authorised in the same procedure as a line extension, in exceptional cases. It needs written agreement from the RMS and those 'additional' CMSs and a complete consolidated Modules 1–5 dossier, and without either the procedure cannot start. A more flexible route is not a lighter submission.
Written by RafiHive Regulatory Team · Published 20 November 2026 · Last reviewed 20 November 2026
Sources: CMDh · European Commission
What did the CMDh change in Rev. 8?
One thing. The CMDh's recommendations on extension applications in the mutual recognition and decentralised procedures (CMDh/069/1999) are now at Revision 8, dated November 2026 and published on 19 November. The revision history records a single change: Section 5 gains a new Section 5.4 for the exceptional situation where an MAH submits an application for a product that is a line extension in the RMS, while the originator product is not authorised in the additional CMSs.
Until now, the general principles in Section 2 closed that door without exception. The existing marketing authorisation has to be authorised in the Member State where the extension is submitted, so a line extension cannot refer to a product authorised in another Member State. That sentence is still there. Rev. 8 adds a pointer to Section 5.4 for exceptional cases.
| Before Rev. 8 | From Rev. 8 |
|---|---|
| A line extension could only be submitted where the originator product is authorised. | Still the rule. Section 5.4 adds an exception for 'additional' CMSs where the originator is not authorised. |
| Markets without the originator needed a separate application outside the extension procedure. | They can join the same MRP/DCP, by prior written agreement and with a complete Modules 1–5 dossier. The extension box is not ticked for them in the application form. |
Rev. 8 does not make line extensions easier. It lets one procedure carry two different kinds of application: an extension where the originator is authorised, and something close to a full application where it is not.
What are the conditions for the new route?
Section 5.4 applies in 'exceptional circumstances' where the MAH wants to submit, in some CMSs where the originator product is not authorised, an application for a product that is a line extension in the RMS. The guidance calls those Member States the 'additional' CMSs. The application can be submitted provided that:
- The MAH liaises with the RMS and the additional CMSs to get a written agreement for the submission.
- The additional CMSs reply to the MAH, copying the RMS, saying whether they can accept the application. That correspondence goes into the dossier.
- The MAH submits the whole consolidated dossier, Modules 1 to 5, because no reference can be made to the originator dossier in this case.
Because the application is not an extension in the additional CMSs, the extension box in the application form is not ticked for them. The consequence of a gap is spelled out: if the written agreement from the additional CMSs is missing, or the whole dossier is not submitted, a validation issue is raised that prevents the start of the procedure.
Two things then happen on the authorities' side. The RMS sends the available quality, non-clinical and clinical assessment reports for the originator product to the additional CMSs, so they can refer to the first assessment. And an additional CMS that accepted the procedure can still comment on the full consolidated dossier. Agreeing to receive the application is not agreeing with it.
The agreement is a precondition, not a formality. Under Section 5.4, a missing letter from one additional CMS stops Day 0 for the whole procedure.
Why is a complete dossier the hard part?
In an ordinary line extension, the applicant does not resubmit everything. CMDh's first example in Section 4 is a 10 mg strength added to a 5 mg product: the new application is treated as based on a complete dossier even if it refers to parts of the originator dossier instead of resubmitting those data. That is the economy a line extension offers.
Section 5.4 removes it for the additional CMSs. No reference can be made to the originator dossier, so the consolidated Modules 1 to 5 have to be in the submission. For a product whose originator was authorised years ago, that means finding, reformatting and possibly updating data that the RMS assessed long before the current guidelines, and presenting it to Member States seeing it for the first time.
The originator assessment reports help the additional CMSs understand that history, but they do not replace the dossier, and they do not stop those CMSs asking about it.
- Are the originator's Module 3 data still consistent with the current manufacturing process, sites and specifications as authorised in the RMS?
- Do the non-clinical and clinical modules still stand against the scientific guidelines that apply today, or will gaps show up once read as a new application?
- Is there a current Module 2 that summarises the consolidated data rather than the original submission?
- Can the dossier be assembled in time for the written agreements, which come first, to still describe what is submitted?
Which route applies to my line extension?
Section 5 of the guidance sorts extensions by how the originator product was authorised. Section 5.4 is the fourth case, not a replacement for the other three.
| Originator authorised through | Where the extension is submitted | Route under CMDh/069/1999 Rev. 8 |
|---|---|---|
| MRP or DCP (5.1) | The same RMS and CMSs | MRP after national authorisation of the extension in the RMS, or DCP with the RMS of the initial procedure. A national extension in a CMS is not possible. |
| Independent national procedures only (5.2) | Member States where the originator is authorised | National procedures, or MRP/DCP after harmonising the SmPC, PL and labelling (by worksharing type II variation under C.4, or an Article 30 referral). Or a complete Article 8(3) application if the MAH holds the full dossier. |
| A mixture of national and MRP/DCP (5.3) | Member States where the originator is authorised | MRP/DCP where the originator went through MRP/DCP. National, MRP or DCP where it is national; parallel procedures are acceptable. |
| Not authorised in some target Member States (5.4) | RMS and CMSs where it is authorised, plus 'additional' CMSs where it is not | Exceptional route: written agreement from the RMS and additional CMSs, complete Modules 1–5, extension box not ticked for the additional CMSs. |
If the additional CMSs do not agree, Section 2 still applies: a line extension cannot be submitted in a Member State where the originator is not authorised, so those markets need their own application.
A worked example
MAH X holds product A 5 mg, authorised through a DCP with the Netherlands as RMS and Belgium and Sweden as CMSs. It wants a new 10 mg strength, A′, in those three countries and also in Poland and Romania, where A has never been authorised.
- Route: a DCP with the Netherlands as RMS, since Section 5.1 keeps the RMS of the initial procedure unless there is a good rationale to change. A′ is a line extension in the Netherlands, Belgium and Sweden.
- Before submission: MAH X asks the Netherlands, Poland and Romania for written agreement. Poland and Romania reply to MAH X, copying the Netherlands, and that correspondence goes into the dossier.
- Dossier: complete consolidated Modules 1 to 5 for A′, without cross-reference to the dossier of A.
- Application form: extension ticked for the Netherlands, Belgium and Sweden; not ticked for Poland and Romania.
- During the procedure: the Netherlands sends the quality, non-clinical and clinical assessment reports of A to Poland and Romania. Both may still comment on the full dossier.
Had Poland's reply not been in the dossier, or had Module 4 been replaced by a reference to the A dossier, validation would fail for all five Member States, not only for Poland.
Some questions are not answered by Section 5.4: how the additional CMSs treat the application for the declared legal basis, which national fee applies, and whether the same product name can be used there. Settle them with the RMS and each additional CMS while asking for the written agreement, and record the answers.
What else should be checked before planning a line extension?
Rev. 8 changed only Section 5, but the rest of the guidance still decides whether a line extension is valid at all.
- Same MAH: the extension's MAH must be the MAH of the existing marketing authorisation.
- Same name: the medicinal product name is the same as for the existing authorisation.
- Same legal basis as the originator: Article 8(3), 10, 10a, 10b or 10c of Directive 2001/83/EC, with Section 4's examples for generics and hybrids.
- Same global marketing authorisation: an extension belongs to the originator's global marketing authorisation for data and market protection.
- Annex I of the Variations Regulation: the change must be an extension under Annex I of Regulation (EC) No 1234/2008 as amended. A change that makes the active substance a new active substance is not an extension and needs a new dossier.
- Grouping: extensions can be grouped with variations under Annex III, or as agreed with the RMS, but the group is then assessed as an extension. Extensions are excluded from worksharing.
- No way back: after withdrawing an extension submitted through MRP/DCP, a national procedure can no longer be used for it.
- Paediatric requirements: a new pharmaceutical form or route for a product protected by an SPC, or a patent that qualifies for one, needs PIP results or an EMA waiver or deferral decision to be valid.
- Orphan market exclusivity: for 10 years after an orphan marketing authorisation granted centrally or by all Member States through MRP, an extension for the same indication for a similar medicinal product will not be accepted.
Our view: one procedure, two kinds of application
Section 5.4 solves a real coordination problem. Without it, an MAH entering new Member States with a new strength or form ran two procedures for one product: an extension where the originator was authorised and a separate application everywhere else, with two timetables and two sets of questions. One procedure can now carry both.
It does not lower the evidential bar. The additional CMSs receive what is in substance a complete new application and keep the right to assess it as one. The work moves earlier, into the agreements and the consolidated dossier, and both have to be finished before validation, where a gap stops the procedure for every Member State in it. Applicants should treat Section 5.4 as a planning decision made months before submission, not a box ticked in the application form.
Where RafiHive fits
RafiHive's Module 1 gap check is a cited first-pass review of an EU regional Module 1 for qualified RA review. It helps find likely omissions and validation risks before submission. It is not a competent-authority validator, does not decide whether a dossier is valid, and does not check whether written agreements from additional CMSs exist. For questions about MRP and DCP rules, RafiHive answers from official EU and CMDh sources and cites the passage it used. Check that the citation is CMDh/069/1999 Rev. 8: anything older will not mention Section 5.4.
Official sources
- CMDh: Extension applications in Mutual Recognition and Decentralised Procedures — Member States recommendations (CMDh/069/1999 Rev. 8, November 2026)
- CMDh: Report from the CMDh meeting held on 10–12 November 2026 (EMA/CMDh/252356/2026, 18 November 2026)
- CMDh: Procedural guidance — application for marketing authorisation
- CMDh: Procedural advice on validation of MR/Repeat-use/DC procedures (CMDh/401/2019 Rev. 2, October 2026)
- EUR-Lex: Commission Regulation (EC) No 1234/2008 (Variations Regulation), Article 19 and Annex I
- EUR-Lex: Directive 2001/83/EC, Articles 8(3), 10 to 10c and 28 to 39
Changes since first publication
- 20 November 2026: First published after the CMDh published CMDh/069/1999 Rev. 8 (November 2026) on 19 November 2026, following its 10–12 November meeting (report EMA/CMDh/252356/2026, 18 November 2026).
This article supports research and preparation. Confirm current source versions and have a qualified regulatory professional review decisions before use.